USING BIM WITH IWMS GUIDE

Lifecycle Management with BIM

Things to Consider When Deploying an IWMS

From a lifecycle management perspective, including facility professionals in the project management process allows for a facilities and operation perspective to be presented and considered throughout the building design and construction periods.

The process also presents an opportunity, through the model’s database, to transfer quality data that is generated at different building lifecycle phases to an integrated workplace management system (IWMS), which enables facilities professionals to hit the ground running once the building is commissioned and occupied.

But what information is needed to ensure a seamless transition from the design-build phase to operations?